Assigned Capacity

Assigned Capacity - Thermal Year 2023-2024

Space offered and totally assigned :

9,525,000,000 kWh (ca. 901 MScm @ PCS 10.57275 kWh/Scm), as detailed:

  • 8,890,000,000 kWh (ca. 841 MScm @ PCS 10.57275 kWh/Scm) for Peak Modulation;
  • 635,000,000 kWh (ca. 60 MScm @ PCS 10.57275 kWh/Scm) for Modulation of Punte Costanti.

Auction 6 April 2023 - Modulation of Punte Costanti

Injection since 7 April 2023

Minimum stock level in October 2023: 95%.

  • Space offered: 635,000,000 kWh (ca. 60 MScm con PCS 10.57275 kWh/Scm)
  • Space assigned: 635,000,000 kWh (ca. 60 MScm con PCS 10.57275 kWh/Scm)
  • Weighted average assignment price: 1,10674460 c€/kWh
  • Results auction 6 April 2023


Auction 5 April 2023 - Peak Modulation with seasonal injection since April

Injection since 6 April 2023


Auction 14 March 2023 - Servizio di Riempimento in Controflusso

  • Period: since 15 to 31 March 2023
  • Injection capacity offered: 63,500,000 kWh/d
  • Injection capacity requested: 188,757,600 kWh/d
  • Injection capacity assigned: 63,500,000 kWh/d
  • Marginal price of assignment: 0.323 c€/d/kWh/d


Auction 13 March 2023 - Servizio di Giacenza Residua

Auction open to the Assignee of storage capacity in the thermal year 2022-2023

  • Space offered: 1,400,000,000 kWh (ca. 132.4 MScm with PCS 10.57275 kWh/Scm)
  • Space requested: 1,270,305,900 kWh (ca. 120.1 MScm with PCS 10.57275 kWh/Scm)
  • Space assigned: 1,239,185,900 kWh (ca. 117.2 MScm with PCS 10.57275 kWh/Scm)
  • Weighted average assignment price: 0,33030330 c€/kWh
  • Results auctions 13 March 2023


The documentation for the assignment procedure is published at Forms.