Assigned Capacity
Assigned Capacity - Thermal Year 2023-2024
Space offered and totally assigned :
9,525,000,000 kWh (ca. 901 MScm @ PCS 10.57275 kWh/Scm), as detailed:
- 8,890,000,000 kWh (ca. 841 MScm @ PCS 10.57275 kWh/Scm) for Peak Modulation;
- 635,000,000 kWh (ca. 60 MScm @ PCS 10.57275 kWh/Scm) for Modulation of Punte Costanti.
Auction 6 April 2023 - Modulation of Punte Costanti
Injection since 7 April 2023
Minimum stock level in October 2023: 95%.
- Space offered: 635,000,000 kWh (ca. 60 MScm con PCS 10.57275 kWh/Scm)
- Space assigned: 635,000,000 kWh (ca. 60 MScm con PCS 10.57275 kWh/Scm)
- Weighted average assignment price: 1,10674460 c€/kWh
- Results auction 6 April 2023
Auction 5 April 2023 - Peak Modulation with seasonal injection since April
Injection since 6 April 2023
- Space offered: 6,571,314,100 kWh (ca. 621.5 MScm con PCS 10.57275 kWh/Scm)
- Space assigned: 6,571,314,100 kWh (ca. 621.5 MScm con PCS 10.57275 kWh/Scm)
- Assignment price: 0.79110000 c€/kWh
- Results auction 5 April 2023
- Assignment procedure - auction 5 April 2023
Auction 14 March 2023 - Servizio di Riempimento in Controflusso
- Period: since 15 to 31 March 2023
- Injection capacity offered: 63,500,000 kWh/d
- Injection capacity requested: 188,757,600 kWh/d
- Injection capacity assigned: 63,500,000 kWh/d
- Marginal price of assignment: 0.323 c€/d/kWh/d
Auction 13 March 2023 - Servizio di Giacenza Residua
Auction open to the Assignee of storage capacity in the thermal year 2022-2023
- Space offered: 1,400,000,000 kWh (ca. 132.4 MScm with PCS 10.57275 kWh/Scm)
- Space requested: 1,270,305,900 kWh (ca. 120.1 MScm with PCS 10.57275 kWh/Scm)
- Space assigned: 1,239,185,900 kWh (ca. 117.2 MScm with PCS 10.57275 kWh/Scm)
- Weighted average assignment price: 0,33030330 c€/kWh
- Results auctions 13 March 2023
The documentation for the assignment procedure is published at Forms.