Access Procedures

Access Procedures - Thermal Year 2023-2024

Regulation (EU) 2023/427 amending Regulation (EU) 833/2014

Last February, 25th 2023, the Council of the European Union adopted the Regulation (EU) 2023/427 amending Regulation (EU) 833/2014 concerning restrictive measures in view of Russia’s actions destabilising the situation in Ukraine, published at link

In accordance with and as a result of how much ruled in the Article 5p of the Regulation (EU) 2023/427: “[..]. 1.It shall be prohibited to provide storage capacity as defined in Article 2(1), point 28 of Regulation (EC) No 715/2009 of the European Parliament and of the Council in a storage facility as defined in Article 2, point 9 of Directive 2009/73/EC of the European Parliament and of the Council, except for the part of liquefied natural gas facilities used for storage, to: (a) a Russian national, a natural person residing in Russia, or a legal person, entity or body established in Russia; (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than 50 % by a legal person, entity or body referred to in point (a) of this paragraph; or (c) a natural or legal person, entity or body acting on behalf or at the direction of a legal person, entity or body referred to in point (a) or (b) of this paragraph [..]”.

As also known, the Regulation (EU) 2023/427 is binding in its entirety and directly applicable in all Member States. Such that the provisions and prohibitions contained therein operate in the Italian State and govern all relations between the operator Edison Stoccaggio S.p.A. and the applicants/users, access and provision of the storage service.

For this purpose, we invite you to read the provisions of Regulation (EU) 2023/427 and to send to Edison Stoccaggio S.p.A. a signed copy of the declarations as follows:

Edison Stoccaggio S.p.A. reserves the right to request all the documentation deemed necessary to carry out the checks that it deems necessary in order to proceed with the correct application of the provisions of the Regulation (EU) 2023/427.

We inform that Delibera 04 aprile 2023 150/2023/R/gas all’ art. 1 comma v) establishes:

- che la capacità eventualmente assegnata in violazione del regolamento 2023/4271, rientri nella disponibilità dell’impresa di stoccaggio per il conferimento, fermo restando il pagamento dei corrispettivi dovuti da parte dei soggetti assegnatari


The documentation for the assignment procedure is published at Forms.


Space offered and totally assigned :

9,525,000,000 kWh (ca. 901 MScm @ PCS 10.57275 kWh/Scm), as detailed:

  • 8,890,000,000 kWh (ca. 841 MScm @ PCS 10.57275 kWh/Scm) for Peak Modulation;
  • 635,000,000 kWh (ca. 60 MScm @ PCS 10.57275 kWh/Scm) for Modulation of Punte Costanti.

Auction 6 April 2023 - 11 a.m. CET - Modulation of Punte Costanti

Injection since 7 April 2023

The profiles for the application of balancing charges are published at Operational Communication


Auction 6 April 2023 - 1 p.m. CET - Peak Modulation with monthly injection in April

Injection since 7 April 2023

Assignment procedure - auction 6 April 2023

Please note that, after the overall assignment in the auction of 5 April, this action is not executed.


Auction 5 April 2023 - 1 p.m. CET - Peak Modulation with seasonal injection since April

Injection since 6 April 2023

Monthly profiles for the calculation of the Ru factor and the application of balancing charges are published at Operational Communication


Auction 14 March 2023 - Servizio di Riempimento in Controflusso

  • Period: since 15 to 31 March 2023
  • Injection capacity offered: 63,500,000 kWh/d
  • Injection capacity requested: 188,757,600 kWh/d
  • Injection capacity assigned: 63,500,000 kWh/d
  • Marginal price of assignment: 0.323 c€/d/kWh/d

Assignment procedure for Servizio di Riempimento in Controflusso

Clarifications:


Auction 13 March 2023 - Servizio di Giacenza Residua

Auction open to the Assignee of storage capacity in the thermal year 2022-2023

  • Space offered: 1,400,000,000 kWh (ca. 132.4 MScm with PCS 10.57275 kWh/Scm)
  • Space requested: 1,270,305,900 kWh (ca. 120.1 MScm with PCS 10.57275 kWh/Scm)
  • Space assigned: 1,239,185,900 kWh (ca. 117.2 MScm with PCS 10.57275 kWh/Scm)
  • Weighted average assignment price: 0.33030330 c€/kWh
  • Results
  • Assignment procedure for Servizio di Giacenza Residua