The Overall Space for storage service assigned for the T.Y. 2017-2018 is equal to 9,145,000,000 kWh (equivalent to 865 MSm³ @ PCS 10.57275 kWh/Sm³).
Edison Stoccaggio following the deliberation AEEGSI 149/2012/R/GAS does not provide stategic storage service and make available approximately a volume of 140 MSm³ as strategic reserve.
The contractual services capacities are divided as follows:
Storage Service
|
MSm³
|
kWh
|
SBil
|
-
|
|
SMin*
|
0
|
|
Smod**
|
865
|
9,145,000,000
|
Strategic Service***
|
140
|
|
Overall Injection capacity (CI) associated by Edison Stoccaggio to assigned Overall Space is 73,000,000 kWh/d (equivalent to approximately 6.9 MSm³/d @ PCS 10.57275 kWh/Sm³), and it is divided among different services as follows:
Overall Injection Capacity CI
|
MSm³/d
|
kWh/d
|
CIBil
|
-
|
|
CIMin
|
0
|
|
CImod
|
6.9
|
73,000,000
|
CI during withdrawal period
|
0.5
|
5,499,100
|
Overall Withdrawal Capacity (CEmax) associated by Edison Stoccaggio to assigned Overall Space, is 91,450,000 kWh/g (equivalent approximately to 8.65 MSm³/d@ PCS 10.57275 kWh/Sm³ ), and it is divided among different services as follows:
Overall Withdrawal Capacity CE
|
MSm³/d
|
kWh/d
|
CEBil
|
-
|
|
CEMin
|
0
|
|
CEmod
|
8.65
|
91,450,000
|
(*)Available capacities for Hydrocarbon service have been assumed equal to those allocated in 2016, i.e. equal to 0.
(**)The space for modulation services will be allocated pursuant to D.M. 14 Febbraio 2017.
(***)In compliance with AEEG deliberation 149/2012/R/GAS, Edison Stoccaggio does not perform any allocation procedure for strategic storage services
As provided for in AEEGSI deliberation 297/2012/R/GAS and under the assumption that the offered space for storage services in T.Y. 2017-2018 is entirely allocated, the maximum daily volumes that can be injected / withdrawn at the entry / exit point of the transport network interconnected with the storages for the period April 2017 - March 2018 are published by Edison Stoccaggio here below:
Network Exit point to storages: 6.9 MSm³/d equal to 73,000,000 kWh/d (@ PCS 10.57275 kWh/Sm³)
Network Entry point from storages: 8.65 MSm³/d equal to 91,450,000 kWh/d (@ PCS 10.57275 kWh/Sm³)
Results auctions of peak services:
The Overall Space for storage service offered for the Thermal Year 2017-2018 is equal to 9,145,000,000 kWh (equivalent to around 865 MScm @ PCS 10.57275 kWh/Scm).
Edison Stoccaggio following the deliberation AEEG 149/2012/R/GAS does not provide strategic storage service and make available approximately a volume of 140 MScm as strategic reserve.
Offered Capacities t.y. 2017-2018
Assignment of short term capacity t.y. 2017-2018
Information for the calculation of the capacity available - Thermal Year 2017-2018
Edison Stoccaggio makes available the information necessary for the calculation of the injection capacity available for the peak modulation service and useful information for the calculation of the Ru factor, within the meaning of Article 3.3 of deliberation AEEGSI 77/2016/R/GAS.
Information RU t.y. 17-18
Commercial profiles - Thermal Year 2017-2018
Unavailability of IT system Escomas
In relation to the "obligations for disclosure to users on IT applications" in accordance with Article 26.2 of the “Consolidated Act regulating the quality of the natural gas storage service for the 2015-2018 and for year 2019 regulatory period (RQSG)”, the following unavailabilities are reported:
T.H. 2017-2018 - Unavailability
Implementation of new features in IT system Escomas - previous t.h.
In relation to the "obligations for disclosure to users on IT applications" in accordance with Article 26.1 of the “Consolidated Act regulating the quality of the natural gas storage service for the 2015-2018 and for year 2019 regulatory period (RQSG)”, the following implementations are reported:
T.H. 2017-2018 - Implementation